Project Name
Detention Pond, Excavation, Mass Grading, Water, Sewer & Drainage (WSD) and Paving Facilities to Serve Imperial Forest, Brazoria County, Texas
Client Name
KB Home
Location
11314 Richmond Ave, Houston, TX;
Tel: 281-668-3872
Tel: 281-668-3872
Description of Scope of Works
The primary objectives of this study were to provide construction material testing services for the above-referenced project.
![](https://hozhoventures.com/clients/quartet/wp-content/uploads/2023/08/serv3.jpg)
The general scope of work for quality control for this project consisted following:
- Proof-rolling observations,
- Laboratory determination of clay liner suitability,
- Laboratory and field density testing of the excavated detention pond material,
- Cement Stabilized Sand Proctor testing, compressive strength testing, and backfill density tests,
- Moisture-density & Atterberg limits of lime or lime-fly ash stabilized soils, and soil backfill materials for Water, Sanitary, and Drainage Facilities,
- Field compaction observation and testing of compacted fill materials, and trench backfill materials,
- Rebar Inspection,
- Concrete Mix Design Review,
- Concrete placement observation and testing on utilities and Pilot Channel,
- Concrete compressive strength testing of concrete,
- Result Reporting,
- Providing certifications letter of compliance.